Daily “Clean + Lubricate” as the Baseline
After each shift, remove chips and coolant residue from the fixture surface and collet jaws with a soft cloth or air gun to prevent corrosion and re-clamping errors. Every eight hours, apply a trace of rust preventive oil to spring collets, guide bushings and other moving parts; once a week, add a thin coat of grease to ball-screw nuts and hydraulic cylinder rods to reduce wear. Before any prolonged shutdown, spray anti-rust oil on internal bores and locating faces and wrap them in wax paper or plastic film.
Use ring gauges or master bars every month to verify repeatability of the fixture; log results in the MES. If deviation exceeds 0.005 mm, trigger compensation or repair. For quick-change systems (HSK/Capto), check taper contact percentage every six months—target ≥ 80 %. If lower, re-grind or replace.